Steere Engineering Inc.
News Contact
About Us Our Team
Bridge Engineering Design-Build Bridge Inspection Transportation Engineering Structure Design Construction Support Design
Work with Us Professional Development Company Culture Professional Networking
Who We Are About Us Our Team Services Bridge Engineering Design-Build Bridge Inspection Transportation Engineering Structure Design Construction Support Design Careers Work with Us Professional Development Company Culture Professional Networking NewsContact
Steere Engineering Inc.

On a Cold Day in December...

Steere Inspection Engineers completed routine bridge inspections based on NBI Standards for the Medford, MA Bridge #M-12-036 (3B4). Frigid water and air temperatures made this inspection a bit more interesting being on an Aqualift.

20191218_103432.jpg
SteereEngineeringDecember 19, 2019
Facebook0 Twitter LinkedIn0 Reddit Tumblr 0 Likes
Previous

Happy Holidays

SteereEngineeringDecember 19, 2019
Next

WTS - Rhode Island Construction Tour: Centerville Road Bridge

SteereEngineeringOctober 29, 2019

Steere Engineering, Inc.

2350 Post Road, Suite 100

Warwick, RI 02886

(401) 773-7880

 

WHO WE ARE

About Us

Our Team

 

SERVICES

Bridge Engineering

Design-Build

NBIS Bridge Inspections

Transportation Engineering

Structure Design

Construction Support Design

CAREERS

Current Job Opportunities

Culture

Benefits

CONTACT

 

© 2026 / Steere Engineering, Inc. All Rights Reserved

Steere Engineering, Inc.
2350 Post Road, Suite 100,
Warwick, RI 02886
401-773-7880